Skip to content
Plant installations

TRIO Biomass Pellet Plants Running Across India

From Punjab's paddy fields to Chhattisgarh, TRIO plants turn crop residue into clean fuel every day. Designed, built and supported from Jaipur.

  • Punjab
  • Haryana
  • Madhya Pradesh
  • Chhattisgarh
★★★★★ “Great after-sales support” — Amit Verma, verified client
50+Plants installed
5States
1–4 TPHPellet output per line
JaipurHead office & manufacturing
Our installed plants

Running Today across India

TRIO pellet plants running in 4 states, supported from Jaipur.

50+Plants installed
5States
JaipurHead office
Jaipur HQ
Bright dots: plant states Jaipur HQ Map is illustrative
Plant locations Amritsar, Punjab

Trusted by 50+ Plant Owners

Real TRIO plants running across India. Tap a video to watch it on Instagram.

Plants running in
Watch More on Instagram
★★★★★
“Excellent quality biomass machines and great after-sales support.”
Amit Verma · Verified Client
With every TRIO plant

One Team, From Survey to Startup

We don't just ship machines. Our engineers stay with you until the first bag of pellets is filled, and after.

🔍

Raw material check

Tell us your residue (paddy straw, wheat straw, mustard husk, sawdust) and we match the right machine line.

📐

Plant layout

Shed size, machine placement and power load planned for smooth material flow from bale to bag.

🏭

Made in Jaipur

Shredder, hammer mill, ring die pellet machine and handling equipment, all built in-house.

🔧

Erection & commissioning

Our team installs the line at your site and runs trial production until pellets meet quality.

👷

Operator training

Your staff learn daily operation, die care and basic maintenance on the running plant.

🛠️

Spares & service

Ring dies, rollers and spare parts from Jaipur, with service support after handover.

How we set up your plant

From First Call to First Pellet

Every installation follows the same tested path, so you always know what comes next.

  1. 01

    Enquiry & consultation

    Share your raw material, location and target capacity.

  2. 02

    Site visit

    Our engineer checks the land, power connection and raw material supply.

  3. 03

    Layout & quotation

    You get a plant layout, machine list and cost estimate.

  4. 04

    Manufacturing

    Machines are built and tested at our Jaipur facility.

  5. 05

    Installation

    Dispatch, erection and commissioning at your site.

  6. 06

    Production & support

    Operator training, trial runs and ongoing service.

See how a TRIO plant turns straw into pellets

Collect, shred, grind, pelletize and pack: the five stages inside every plant on this page.

View the process
FAQ

Plant Installation Questions

Can't find your answer? Call our sales team on +91 85059 02337.

Can I visit a running TRIO plant before buying?

Yes. Tell us your location and we will try to arrange a visit to a running TRIO plant near you, so you can see the machines in production and talk to the owner.

Which states have TRIO plants?

TRIO plants are running in Punjab (Amritsar, Bathinda, Badal), Haryana (Narnaul), Madhya Pradesh (Morena) and Chhattisgarh (Bilaspur), supported from our head office in Jaipur, Rajasthan.

How long does installation take?

It depends on plant capacity, the number of machines and how ready your shed and power connection are. We share a clear timeline along with your quotation.

Do you train our operators?

Yes. During commissioning our team trains your operators on daily running, die and roller care, and basic maintenance.

What happens after the plant is handed over?

You get spare parts and service support from Jaipur. Call or WhatsApp our team whenever you need help.